Energy simulation aligned with Estidama Resourceful Energy credits. Whole building LCA per Estidama Stewarding Materials. Daylight simulation for Livable Buildings credits. Thermal comfort modelling for the Livable Buildings comfort credits. PBRS submission documentation. PVRS and PCRS scope where applicable. Review comment rectification through Abu Dhabi DMT.
In the Emirate of Abu Dhabi — including Abu Dhabi city, Al Ain and Baniyas. The Pearl Rating System is administered through the Department of Municipalities and Transport (DMT). Dubai projects follow different frameworks; for those we deliver LEED and LCA.
Villa energy modelling — including five villa typologies for a single development and a six-bedroom villa programme — car showrooms in Baniyas and Abu Dhabi, and an office LCC and thermal comfort study.
Yes. We rectify the model and re-document through the DMT review process, whether or not we built the original model.
Yes. Same building, one source-of-truth model, two sets of compliance documentation.
Typically 2 to 4 weeks depending on scope. Definitive timelines and pricing are provided as a technical proposal once we receive the project scope and drawings.
Yes. NDA by default, deliverables in your template, responses in the language the reviewer expects.