| Parameter | Description |
|---|---|
| Typical Gross Floor Area | 5,000–500,000+ m² |
| Typical Number of Floors | 1–6 |
| Typical HVAC Systems | Central Chilled Water Plants, AHUs, VAV Systems, Heat Recovery |
| Occupancy Density | High and highly variable |
| Operating Schedule | 24 hours/day |
30,000 sqm office in Iberia. LEED v4 BD+C. Four floors above grade. VRF system serving fan-coil units. ASHRAE 90.1 Appendix G baseline. Engineered for first-time review.
Project Country: Spain
Building Area: 11,000 sq.m
No. Of. Floors: G+16
No. Of. Zones: 125
Modeling Complexity: Medium
Simulation Run Time: High
Project Country: Hungary
Building Area: 6,000 sq.m
No. Of. Floors: G+6
No. Of. Zones: 50
Modeling Complexity: low
Simulation Run Time: low
Project Country: Portugal
Building Area: 8,000 sq.m
No. Of. Floors: 2 B+G+6
No. Of. Zones: 80
Modeling Complexity: Medium
Simulation Run Time: Medium
Project Country: Ireland
Building Area: 5,000 sq.m
No. Of. Floors: 2 B+G+4
No. Of. Zones: 55
Modeling Complexity: Medium
Simulation Run Time: Medium
Project Country: USA
Building Area: 155,000 sq.m
No. Of. Floors: 2 B+G+26
No. Of. Zones: 150+
Modeling Complexity: High
Simulation Run Time: High
| Parameter | Description |
|---|---|
| Typical Gross Floor Area | 500 – 250,000+ m² |
| Typical Number of Floors | 1–6 |
| Typical HVAC Systems | Packaged DX Units, VRF, Chilled Water Systems, Rooftop Units |
| Occupancy Density | High and variable (3-8 m²/person) |
| Operating Schedule | 10-16 hours/day, 7 days/week |
| Specialized Load | Task Lighting |
Project Country: Saudi Arabia
Building Area: 2,800 sq.m
No. Of. Floors: B+G+1
No. Of. Zones: 40 – 50
Modeling Complexity: Low
Simulation Run Time: Low
Project Country: Spain
Building Area: 800 sq.m
No. Of. Floors: G+1
No. Of. Zones: 20 – 40
Modeling Complexity: Low
Simulation Run Time: Low
Project Country: UAE
Building Area: 13,000 sq.m
No. Of. Floors: G+1
No. Of. Zones: 30 – 40
Modeling Complexity: Medium
Simulation Run Time: Medium
| Parameter | Description |
|---|---|
| Typical Gross Floor Area | 5,000 -200,000+ m² |
| Typical Number of Floors | 3 – 10+ |
| Typical HVAC Systems | Chilled Water Systems, VRF, FCUs, DOAS, Heat Recovery Systems |
| Occupancy Density | Medium (guest rooms with intermittent occupancy) |
| Operating Schedule | 24 hours/day |
Project Country: Spain
Building Area: 10,000 sq.m
No. Of. Floors: G+6
No. Of. Zones: 500 – 550
Modeling Complexity: High
Simulation Run Time: High
Project Country: Hungary
Building Area: 20,000 sq.m
No. Of. Floors: G+6
No. Of. Zones: 100 – 250
Modeling Complexity: Medium
Simulation Run Time: Medium
Project Country: UAE Building Area: 50,000 sq.m No. Of. Floors: G+6 No. Of. Zones: 600 – 800 Modeling Complexity: High Simulation Run Time: High
|
Typical Project Characteristics
| Parameter | Description |
|---|---|
| Typical Gross Floor Area | 20,000-500,000+ m² |
| Typical Number of Floors | 5-80+ |
| Typical HVAC Systems | Central Chilled Water Plants, VRF, District Cooling, Mixed HVAC Systems |
| Occupancy Density | Highly variable by function |
| Operating Schedule | Multiple schedules operating simultaneously |
Project Country: Egypt
Building Area: 20,000 sq.m
No. Of. Floors: G+4
No. Of. Zones: 50 – 100
Modeling Complexity: Medium
Simulation Run Time: Medium
Project Country: Moscow, Russia
Building Area: 20,000 sq.m
No. Of. Floors: G+6
No. Of. Zones: 100 – 150
Modeling Complexity: Medium
Simulation Run Time: High